Some of the servers work great with the SP8 upgrade others hit a brick wall and consume the cache memory on loading even with the static memory assignment.
I think this traces back to the speed of the hardware loading the other nlm's before the avamar aganet is fully loaded.
Will be testing this theory tonight and posting updates.
2 comments:
Well a little sifting through console.log files I decided to give the delay command a try. I put a 30 second delay before I call Avamar then I placed a 60 second delay before calling the next product that is Groupwise.
I noticed that Groupwise was initializing before Avamar had fully loaded and they can both be memory hogs.
I will update after some testing.
Here is what the modified section of my autoexec.ncf looks like
# Added by Avamar Client Install
DELAY 30
SYS:\AVAMAR\BIN\AVCTL.NLM start
DELAY 60
grpwise
Post a Comment